أعلن هنا


»  Five New Projects in Jazan and Najran Areas


7-1-2012
His Excellence ,Dr. Jbara Bin Eid Al-Seraisary , the minister of transport, has signed contracts of five new projects in Jazan and Najran areas.

»  Two projects accomplished in Jazan


6-10-2011
Two projects accomplished in Jazan. they are Sabia-Edabi road and Ardha Water project . the first is a dualization road which joins several villages on the road from Sabia to Edabi. The second a Water network with 4 tanks and some roads.

»  Al-Ardha and Neighbouring Villages Water Projects


9-9-2011
Al-Ardha and Neighbouring Villages Water Projects:

»  ISO 9001-2008 Certificate attained by the Company


30-1-2011
ISO 9001-2008 Certificate attained by the Company

»  His Excellence , The Minister of Transport visit to Najran Projects.


16-10-2010
His Excellence , The Minister of Transport visit to Najran Projects.

»  Seven new projects in Najran, Jazan and Al-Jouf


27-7-2010
His Excellence ,Dr. Jbara Bin Eid Al-Seraisary , the minister of transport, has signed contracts with the company of four new projects in Najran, Jazan and Al-Jouf

»  Primary Hading Over of the project of Al-Jurba and Al-Hosain Bridges.


6-7-2010
Primary Hading Over of the project of Al-Jurba and Al-Hosain Bridges.

»  His Excellence , The Minister of Transport signs a-130-million contract for the Company


16-2-2010
His Excellence ,Dr. Jbara Bin Eid Al-Seraisary , the minister of transport, has signed a contract for Al-Masar Al-Hadeeth Co. to implement roads with a cost of SR 130 million. The Company representative Eng. Ansel Al-Sogour shared signature event with him ;

»  Group 6 handed over in Najran


31-1-2010
on Jan 31.2010 Group 6 project was handed over to the Ministry in Najran. This project wich consists of many links of local roads served about ten villages in the area

»  Erection of Tiles and Bricks Factory


30-12-2009
On Dec 30,2009, The company erected a factory for bricks and tiles which responds to the needs of the company's projects

»  Al-Haqo, Azziyeen and Haroub project Handed over


4-4-2009
on April 4,2009 This project which connects these villages that lay on the side of the mountains in the area was completed and handed over to the Ministry of Transport. It is about 30 kilometers long and cost 35 million riyalson April 4,2009 This project which connects these villages that lay on the side of the mountains in the area was completed and handed over to the Ministry of Transport. It is about 30 kilometers long and cost 35 million riyals

»  Balghazi Roads project handed over on March 30,2009


30-3-2009
This project handed over on March and consists of 5 links in the area of Jazan, close to the mountains of Fifa. it is 30 kilometers long and cost more than 40 million riyals.

Home
|
Feed back
|
Vacancies
|
Contact Us

© 2009 Al-Masar, All Rights Reserved.

Designed & Developed by Tech Heights design websites Graphics Heights Agency design، magazines، advertising، marketing، design logos